MASTER'S HOUSE NIGERIA

In 2009, Boston University Center for Global Health and Development (in collaboration with Initiative for Integrated Community Welfare in Nigeria) released a study showing that 10% of children in Nigeria are orphaned. The study also ranked Akwa Ibom state as being second in prevalence of orphans.

MCCF MASTER'S HOUSE ORPHANAGE IN NIGERIA

The Master’s House will be located in Uyo, Akwa Ibom. This will be a place where children will be loved, sheltered, fed, clothed and provided with health care. Beyond these, children at the Master’s Home will be cared for by people who see caregiving as an act of love and obedience to Jesus Christ, and not simply a job that affords them an income. The cost of building the Masters House is $200,000 (All donations are tax deductible).

COMPLETED PROGRESS

HERE IS WHAT HAS BEEN COMPLETED SO FAR

In February of 2011, MCCF became an official 5013C foundation, selected a US board and appointed a Nigerian board. Following, an architect was hired to draw up the building plans, the property was acquired and then cleared. A well was then added to provide running water for the orphanage, including showers and flushing toilets. Roadwork had to be done to access the property, and fencing had to be added to the perimeter. The next step was to build the foundation for the building and add ground floor decking. Lastly, a storage and security building was built on-site.

REMAINING BUILDING PHASES

$40,000

There is a $20,000 match available for the completion of this phase. This means that for every dollar donated, another dollar will be matched by this source. This phase will take 6-8 weeks to complete once all of the funds have been raised.

 

PHASE 1 BREAKDOWN

Completion of this phase

will enable us to open for business. This includes registering the orphanage, performing administrative work, receiving shipment from US and hiring staff.

 

COMPLETE GROUND FLOOR

bathroom

foyer

office

kitchen

dining hall

storage

 

SHIPMENT FROM US

supplies for orphanage

 

FINISH FENCING, GATE,

ROADS AND GROUNDS OUTSIDE

$25,000

In this phase, the first floor will be completed, enabling the orphanage to begin taking in children. This phase will take 4 weeks to complete once all of the funds have been received.

 

PHASE 2 BREAKDOWN

Completion of this phase will enable us to start taking children into the orphanage. The first floor can accommodate up to 40 children.

 

(the 1st floor is the 2nd story)

 

COMPLETE FIRST FLOOR

children dorms

staff room

bathrooms

fellowship hall

$35,000

The completion of Phase 3 will enable us to open the orphanage to full capacity with full staff, babies, boys & girls. This phase will take 5-6 weeks to complete once all of the funds have been raised.

 

PHASE 3 BREAKDOWN

Phase 3 will see the completion of the second floor (the 3rd story) as well as the addition of permanent roofing to the orphanage. At this stage, the orphanage will be opened to full-capacity.

 

COMPLETE SECOND FLOOR

girl's housing

babies

staff room

girl's bath

recreation room

 

PERMANENT ROOF ADDED

$10,000

The completion of this final Phase will open up the outdoor playground and picnic area for the children.

 

PHASE 4 BREAKDOWN

Completion of this phase

will give the children an outdoor playground and a picnic area to enjoy.

 

Outdoor playground

 

Picnic area